Wind

Tow Law

Location:
Tow Law, County Durham
System Size:
3 x 0.800 MW (Project capacity 2.300 MW)
Output:
1,400*

Further details:

Number of turbines: 3

manufacturer and rating: Nordex 770 0.800 MW

started generating: December 2001

operator: npower renewables

developer: npower renewables

owner: npower renewables

hub height: 50 m

rotor diameter: 50 m

Close This Window

Main Panel
Region Map
Wind
North East England
Projects in NorthEast England
ViewHideList
Wind
Wind
Wind
View/HideList
Solar PV
Solar PV
Solar PV
View/HideList
Solar Thermal
Solar Thermal
Solar Thermal
Geothermal
Geothermal
Geothermal
Hydro
Hydro
Hydro
Biomass
Biomass
Biomass
View/HideList
Hydrogen
Hydrogen
Hydrogen
Wave and Tidal
Wave and Tidal
Wave and Tidal
Other
Other
Other