Wind

3Hs - Holmside Hall

Location:
Holmeside, County Durham
System Size:
2 x 2.750 MW (Project capacity: 5.500 MW)
Output:
2,800*

Further details:

Number of turbines:

manufacturer and rating: NEG Micon 2.750 MW

started generating: May 2004

operator: E.on Renewables

developer: AMEC Wind

owner: E.on Renewables

hub height: 60 m

rotor diameter: 80 m

Close This Window

Main Panel
Region Map
Wind
Projects in County Durham
ViewHideList
Wind
Wind
Wind
View/HideList
Solar PV
Solar PV
Solar PV
View/HideList
Solar Thermal
Solar Thermal
Solar Thermal
Geothermal
Geothermal
Geothermal
Hydro
Hydro
Hydro
Biomass
Biomass
Biomass
View/HideList
Hydrogen
Hydrogen
Hydrogen
Wave and Tidal
Wave and Tidal
Wave and Tidal
Other
Other
Other
Teesdale Wear Valley Derwentside Chester-Le-Street Durham Easington Sedgefield